How Often Should a Block of Flats Have a Fire Risk Assessment?

Every managing agent eventually faces the same question from a client or a leaseholder. How often does the building need a fire risk assessment? The law gives no fixed answer, which leaves many agents unsure whether their review cycle would stand up to scrutiny from a fire safety inspector. Here is what the law says, what the guidance recommends and how we approach it in practice.

What the law says


Article 9 of the Regulatory Reform (Fire Safety) Order 2005 requires the responsible person to review the fire risk assessment regularly. It must also be reviewed when there is reason to suspect it is no longer valid, or when there has been a significant change to the building or the way it is used. The Order does not set a fixed period.

Since 1 October 2023, every responsible person must record the full assessment in writing, along with the name of the person or organisation who carried it out. An assessment that is several years old, or one with no clear author, is now much harder to defend.

What the guidance recommends


The Local Government Association's guide to fire safety in purpose-built blocks of flats gives a useful starting point. For low-rise blocks of up to three storeys built within the last 20 years, it suggests a review every two years and a new assessment every four years. For older blocks, or those over three storeys, it suggests a review every year and a new assessment every three years. The highest-risk buildings may need a new assessment every year.

In practice, most residential blocks we see work to an annual review. We think that is a sensible default for the majority of buildings, particularly converted houses, older blocks and HMOs, where small changes can quickly affect the level of risk.

Taking over a new block?Ask for the current fire risk assessment on day one. If it is more than a year old, still refers to the withdrawn PAS 79-2, or does not record who carried it out, plan a fresh assessment as an early priority.

When a review is needed sooner


Some events should prompt a review whatever the date on the last report. These include refurbishment or maintenance work that affects walls, ceilings or fire doors, such as new cabling or pipework passing through compartment walls. A change of use in part of the building, such as a ground floor shop becoming a takeaway, should also trigger a review.

Other triggers include a fire or near miss, a letter or notice from the fire and rescue service, and a change to the building's evacuation strategy. Changes among the residents can matter too, for example when you become aware of a resident who would need help to evacuate. Finally, a change of responsible person or managing agent is a good time to check that the assessment is current and properly recorded.

Which type of assessment do you need?


Fire risk assessments for blocks of flats are usually described as one of four types. A Type 1 assessment covers the common parts without opening up the building, and it is the normal starting point for most blocks. A Type 2 assessment also covers the common parts but involves some destructive inspection, such as lifting ceiling tiles or opening service risers, usually with a contractor present.

Type 3 and Type 4 assessments extend into a sample of the flats themselves, without and with destructive inspection respectively. They are generally used when there are concerns about the building's compartmentation or the standard of conversion work, which is common in older converted houses.

Since 2025, housing fire risk assessments have been covered by BS 9792:2025, which replaced PAS 79-2. The new standard gives a clearer structure for assessment and recording, and it includes guidance on periodic review. If your current reports still refer to PAS 79-2, it is a sign that they were written before the new standard was published.

A review should still be a fresh look


A review should involve more than updating the dates on last year's report. A good review means walking the building again, checking whether earlier actions have been completed, and looking for new risks such as stored items in corridors, damaged fire doors or new penetrations through fire-resisting walls.

How we can help


We carry out fire risk assessments for blocks of flats and HMOs across the North West, North Wales and the West Midlands, in line with BS 9792:2025. For managing agents, we can schedule reviews across your whole portfolio so that each building is assessed on the right cycle. Our reports follow a consistent format, with actions clearly prioritised, so you can see at a glance what needs attention. Assessments start from £395.

Are your assessments up to date?

If you would like a review schedule set up across your portfolio, or a fresh assessment for a block you have just taken on, please get in touch.

This article provides general information only and does not constitute legal advice. Review periods should be set according to the risk at each building, and the fire risk assessment itself should state when it is next due for review.

Previous
Previous

Who Checks a Delivery Rider's Battery? Nobody.

Next
Next

Fire Safety Training for Hotels, Pubs and Restaurants